KKTONER 2 x Square Bar Stools PU Leather Swivel Adjustable Counter Stool Office Chair With Footrest (Black)
KKTONER Black Square PU Leather Bar Stool With Footrest Set of 2
- The height adjust easily by pulling the handle up and down to meet different occasions.
- Strong base and Hydraulic gas lift. Single stool can hold up to 135 KG.
- Semi-circular footrest relax you feet enough, providing comfort better.
- 360 Degree Swivel Perfect fit Shop,Bars,Pub,Clinic,Restaurant, Counter, Guitar, Breakfast etc.
- Anti slip with nylon foot caps, protect your floor better, and more stable.
- Easy to assemble: require a few steps base on the assemble manual in 5 minutes.
Product Characteristics
| | | |
|---|---|---|
WaterproofThe cushion is wrapped in PU leather, water and oil proof, easy to clean. | Metal FootrestSturdy steel pedals provide better support for the feet, and increase the life of the chair. | Fashion Square SeatStylish corrugated cushions to better decorate your home. |
| Weight: | 5 kg |
| Dimensions: | 53.79 x 43.29 x 31.4 cm; 5 Kilograms |
| Brand: | KKTONER |
| Colour: | Black |
| Colour: | Black |
He comprado 3 veces estos taburetes para mi casa, y a este precio son una autntica maravilla.
Son pequeos, ocupan poco espacio y permiten guardarlos en zonas estrechas para el paso por la cocina. Son regulables en altura, mucho recorrido.
El mullido est bien, est logrado y para estar 30 minutos comiendo o desayunando son cmodas.
Las primeras que compr hace ya 10 aos me siguen durando, aunque han ido teniendo holgura (peso 100kg) y las hemos llevado al pueblo.
Excuse my child screaming at her xbox game in the background on the video!
Fantastic stools! Easy to put together and sturdy.
6 mois que j’ai les chaises, elle correspond a ce que j’ai demande au vu du prix je ne suis pas du elles sont solide et pratique avec une table haute ou pour un bar. Facile monter galement. Niveau confort on a vu mieux mais fait l’affaire.
Bellissimi da vedere ma soprattutto comodi nell seduta. Il montaggio ultra facile
Good value for these pair of bar stools – sturdy and easy to assemble ! Looks very nice at my breakfast bar.
Facile da montare. La seduta anche comoda. Si adatta benissimo all’ altezza della mia penisola. Al momento ritengo di aver fatto una buona scelta.
These stalls were such good value as they were sturdy and comfortable and super easy to put togethe
Really easy to assemble. Literally took minutes. The company were very quick to answer and resolve a query I had. Cheap and cheerful
Tabouret facile monter, en 10 min c’est boucl ! Ont y est trs bien assis et monte assez haut. Parfait pour une table haute ou bar ! Je recommande 100 %
For the price I can’t really complain, and they do look good but they get uncomfortable after 10/15 minutes of sitting on them
Next day delivery, look great in situ, easy to assemble no tools required. 59yr old granny and built them myself. One stool has a tiny scratch on the base but these are for our in kitchen breakfast bar and will only be used by us for occasional use so not worth returning hassle.
They look fabby and are comfy. Really good value for the price.
Good bar stools. Easy to assemble and look smart. Comfortable and easy clean.
Easy to set up and look good. All-in-all, very good value given the price.