10M HDMI Cable v1.4 by True HQ™ | HIGH SPEED Long Lead
10M HDMI Cable v1.4 by True HQ™ | HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV | Black & Gold Plated



Questions and Answers
Q: What version is this HDMI cable?
A: These are high speed HDMI 1.4a cables. With a bandwidth speed of 10.2Gbps.
Q: Do these cables work with a 4K TV
A: They will work on a 4K TV if the device used to connect to the TV is outputting a 1080p resolution. For example a 1080p Blu-Ray Player or Standard Sky HD Box – these will work fine.
Q: Will these cables work with SKY HD and Sky Q?
A: Absolutely but only at 1080p. Does not work with Sky Q at 4K 2160p resolution. You would need to set Sky Q video resolution to 1080p.
Q: Do these cables work with Virgin Media TV boxes?
A: You will also need to go into the settings and change the video output resolution to 720p/1080p. Then these cables should provide a signal.
Q: Do they support ARC?
A: Yes they have full support for ARC (Audio Return Channel)
Q: Do these work with Dolby Atmos?
A: Yes they do.
Q: Can this cables work from a Laptop to a Projector
A: Yes they will, please make sure the video output resolution is set no higher than 1080p at 60Hz.
Q: Will these work on an Xbox or PS4 games console?
A: Yes. Only at 1080p. Will not work with PS4 Pro and Xbox One X with resolution set to 2160p.
Q. Are these cables suitable for running outside?
A: No, these cables are not waterproof. You can run outside but would need to protect them in weatherproof trunking.
Q. Are these cables compatible with a HDMI splitter?
A: Yes this cables should work fine with most HDMI splitters. Especially “powered” splitters. However, sometimes they can cause problems and we would recommend testing without first.
Help and Advice
Q. I’ve set the resolution to 1080p but the cable is still not working?
A: Please note that some devices come with a “low powered” HDMI port and this can cause problems with long HDMI cables over 5 meters in length. So if there is an issue, please test with a PC or Laptop, as these will usually have enough power to carry the signal.
**Please always test the cable first before running through walls, under skirting boards or trunking to make sure they are compatible with your set-up**
| Dimensions: | 20.2 x 18.9 x 5.2 cm; 590 Grams |
| Model: | TRUEHQ-HDMI-10M |
| Manufacture: | True HQ |
| Dimensions: | 20.2 x 18.9 x 5.2 cm; 590 Grams |
| Origin: | China |



I bought this to connect my pc to a tv on the other side of the room, therefore it does not get moved much, however the build quality would make me not want to, it works perfect for my use, my tv is only 1080p 60hz so I can’t provide any insight on higher quality displays but would highly recommend if looking for a similar use case to mine
The first HDMI I got didn’t work and it almost ruined my plan for the day. However, after my previous feedback, the seller reached out to me and replaced the item with an upgraded one, swift delivery and not only that, he refunded the first payment. This is pure customer satisfaction met and I appreciate this gesture of making things right. Although, I wished he didnt refund and just replaced it, so I will be ordering again from the seller. Thank you Luke for the new HDMI, works well.